One yard or thirty, delivered from West Palm Beach to Miami. Every price published, by the cubic yard.
Enter your measurements and we will fill in the yards for you.
Estimate based on published yard pricing. Material settles and compacts — order slightly heavy rather than short. Final delivered price is confirmed by dispatch before the truck rolls.
Proof
Every load photographed before the truck pulls off.
What we carry
Rock, base, sand, recycled, earth and decorative stone — all sold by the cubic yard.
#57 Gravel Rock · #89 Pea Rock Gravel · #67 Rock
from $37.50 / cu yd 4 materialsRoad Base Limerock · Limerock Screenings · Limerock Fill · Shell Rock
from $25.00 / cu yd 2 materials#4 Ballast Rock · Rip Rap
from $37.50 / cu yd 7 materialsSand and Pea Rock Mixed · Artificial Turf Sand · Paver Sand · Silica Sand · Drainfield Sand · Mason Sand · Fill Sand
from $18.75 / cu yd 3 materialsRecycled Concrete Sand · Recycled Crushed Concrete · Asphalt Millings
from $18.75 / cu yd 2 materialsTop Soil · Fill Dirt
from $11.25 / cu yd 6 materialsWhite Marble Chips · River Rock · Black Lava Rock · Red Lava Rock · Mexican Beach Pebble · Crushed Coquina Shell
Call for quoteWhy order from us
Almost every supplier in South Florida sells by the ton, then leaves you to convert from the cubic yards on your plan using a density figure you have to look up. That mismatch is where most over- and under-ordering comes from. We quote the same unit you measured in.
There is no truckload minimum. One cubic yard is about fifty-four bags from a home centre, several car trips and a very long afternoon — so let the truck bring it. We will also bring eighteen yards at a time, all day, to a job site.
Every rate is published above. Material and delivery are quoted together before you commit, with no fuel surcharge appearing later on the invoice and no callback required to find out what a yard of limerock costs.
How it works
Pick a material, punch in length, width and depth. The ticket converts it to cubic yards and prices the haul to your ZIP. Sixty seconds, no phone call, no salesman.
Choose a delivery date and drop a pin on exactly where you want it. Gate code, low branches, soft spot in the yard — tell us and the driver plans the approach.
Truck arrives, bed goes up, load lands on the pin. You get a photo before the truck pulls off. Whether you spread it that weekend is between you and your back.
Where we deliver
Palm Beach, Broward and Miami-Dade, all run out of one Boca Raton yard. The zones below are about lead time, not price.
Palm Beach County from West Palm south — Lake Worth, Boynton Beach, Delray Beach and Boca Raton.
Next day, occasionally two
All of Broward. Our densest lane and the fastest turnaround on the route.
Next business day
North and central Miami-Dade, including Hialeah, Doral and Medley.
Next business day
West Palm Beach · Lake Worth · Wellington · Royal Palm Beach · Boynton Beach · Delray Beach · Boca Raton
Deerfield Beach · Pompano Beach · Coral Springs · Coconut Creek · Fort Lauderdale · Plantation · Sunrise · Davie · Weston · Hollywood · Miramar · Pembroke Pines
Aventura · North Miami · Miami Gardens · Hialeah · Medley · Doral · Miami · Miami Beach · Coral Gables
Common questions
Multiply length by width in feet, multiply by depth in feet, then divide by 27. A 60 ft by 12 ft driveway at 3 inches deep is 60 × 12 × 0.25 ÷ 27, which is about 6.7 cubic yards — so you order 7.
One cubic yard covers roughly 162 sq ft at 2 inches, 108 sq ft at 3 inches, 81 sq ft at 4 inches, or 54 sq ft at 6 inches. The calculator at the top of this page does all of it for you.
Because that is the unit your plan is drawn in. Selling by the ton forces you to convert using a density figure that differs for every material — rock is about 1.4 tons per yard, compacted base closer to 1.65, topsoil nearer 1.15. Getting that conversion wrong is how people end up two yards short on a Friday afternoon. We quote yards, you order yards.
One cubic yard. There is no truckload rule — if you need a single yard of topsoil for one planting bed, that is a real order and we will bring it.
One flat fee per order, the same anywhere in Palm Beach, Broward and Miami-Dade. It does not scale with order size — one cubic yard and thirty carry the same fee. Price your load and the delivery line shows on the quote before you commit to anything.
Next business day on most orders placed before noon on a weekday.
Wherever you point, within reason. Tell us about gate codes, low branches, overhead lines, soft ground or a narrow approach when you book and the driver plans for it. A tri-axle needs roughly 60 feet of straight backing room and 14 feet of overhead clearance to dump cleanly.
Yes. Multiple loads a day to a single site is routine, and repeat commercial accounts can be set up with consolidated invoicing. Call dispatch rather than using the online ticket for anything over five loads.
Pick your material, enter your measurements and see the delivered number before you talk to anyone. Then pick a day and let her handle the rest.