Base
Compactable base under asphalt, concrete, pavers and driveways.
Limerock is the base layer almost every hard surface in South Florida sits on. Crushed limestone with the fines left in, so it locks together and compacts to a hard, load-bearing surface rather than staying loose the way washed stone does.
Put it down before asphalt, before a concrete pour, before pavers, or use it on its own for a driveway that holds up to a truck. Compact it in lifts of no more than six inches and wet it as you go, because dry limerock will not bind.
Specification
Common uses
How much to order
One cubic yard is 27 cubic feet. How far that goes depends entirely on how deep you are laying it.
| Depth | 1 cu yd covers | Yards per 500 sq ft |
|---|---|---|
| 2 in | 162 sq ft | 3.1 cu yd |
| 3 in | 108 sq ft | 4.6 cu yd |
| 4 in | 81 sq ft | 6.2 cu yd |
| 6 in | 54 sq ft | 9.3 cu yd |
| 12 in | 27 sq ft | 18.6 cu yd |
The arithmetic: length times width times depth, all in feet, divided by 27. A 40 by 20 ft area at 4 inches deep is 40 × 20 × 0.333 ÷ 27, which is about 9.9 cubic yards, so you order 10. Round up rather than down — coming up two yards short on a Friday costs a whole extra delivery.
Road Base Limerock — common questions
Limerock is the base layer almost every hard surface in South Florida sits on. Crushed limestone with the fines left in, so it locks together and compacts to a hard, load-bearing surface rather than staying loose the way washed stone does.
Compactable base under asphalt, concrete, pavers and driveways. Put it down before asphalt, before a concrete pour, before pavers, or use it on its own for a driveway that holds up to a truck. Compact it in lifts of no more than six inches and wet it as you go, because dry limerock will not bind.
Multiply length by width by depth, all in feet, and divide by 27 to get cubic yards. One cubic yard covers 162 sq ft at 2 inches, 108 sq ft at 3 inches, 81 sq ft at 4 inches or 54 sq ft at 6 inches. The calculator does it for you and converts to tons and truckloads.
Yes. Road Base Limerock is compacted in lifts, so it loses roughly a fifth of its loose volume once it is watered and rolled. Order 20 percent above your plan volume. Our calculator adds that automatically.
$31.25 per cubic yard, plus a flat $200 delivery per order across Palm Beach, Broward and Miami-Dade. Minimum order is one cubic yard.
About 1.65 tons per cubic yard. A tri-axle carries roughly 18 cubic yards or 22 tons, whichever it reaches first, so a full load of Road Base Limerock is about 13.3 cubic yards.
We deliver anywhere from West Palm Beach to Miami — Palm Beach, Broward and Miami-Dade counties. See the service area for lead times by county.
Where we deliver Road Base Limerock
Related materials
Arena footing, pipe bedding, filling and top-dressing where a fine compactable material is needed.
$31.25 / cu yd BaseBulk rock fill for raising grade and bridging soft ground.
$25.00 / cu yd BaseBudget compactable base for drives, pads and access roads.
$27.50 / cu ydPick your material, enter how many cubic yards and see the delivered number before you talk to anyone.