Miami-Dade County
Medley is where the rock comes from, and if you are building anything industrial in Dade you are probably building it here. Delivery is a flat $200 per order, charged once regardless of size.
Almost entirely commercial: truck yards, warehouse pads, laydown areas and access roads. Crushed concrete and limerock base by the truckload rather than the yard.
Quarry country. Rock close to the surface, excellent compaction, and the shortest haul distance of anywhere we deliver because the material is produced next door.
Built for heavy trucks end to end. No access constraints worth mentioning, and the fastest turnaround in our network.
A loaded tri-axle carries about eighteen cubic yards and needs roughly sixty feet of straight backing room and fourteen feet of overhead clearance. If your site is tighter than that, say so when you book and we will send the twelve-yard trailer instead.
NW 116th Way corridor, Okeechobee Road, East Medley, Hialeah border. If you are just outside and not sure, call and ask — the answer is usually yes.
Materials we deliver to Medley
Driveways, French drains, slab base and pipe bedding. The workhorse.
$37.50 / cu yd MaterialCompactable base under asphalt, concrete, pavers and driveways.
$31.25 / cu yd MaterialCost-effective compactable base and fill. Sets up hard.
$18.75 / cu yd MaterialPool decks, walkways, paver base, dog runs and landscape fill.
$37.50 / cu yd MaterialBedding and joint sand for interlocking pavers and brick.
$31.25 / cu yd MaterialSod prep, planting beds, lawn grading and top-dressing.
$12.50 / cu yd MaterialGrade changes, slab prep and lot levelling. Not for growing anything.
$11.25 / cu yd MaterialBrick and block work, mortar, play areas and pool bases.
$35.00 / cu ydMedley — common questions
Yes. Medley is in Miami-Dade County, inside our West Palm Beach to Miami service area. Minimum order is one cubic yard and there is no truckload minimum.
A flat $200 per order, the same as everywhere else we deliver. It does not change with order size, so three yards and thirty carry the same fee.
Next business day on most orders placed before noon on a weekday.
One cubic yard. For scale, a cubic yard is about fifty-four bags from a home centre, so even the minimum is a load worth having delivered.
By the cubic yard, which is the unit your plan is drawn in. No tonnage conversion to get wrong.
Nearby
Pick your material, enter how many cubic yards and see the delivered number before you talk to anyone.